The pipe provides extended system life and optimal performance under rugged conditions. Three-quarter-inch RAUPEX pipe was specified for the project. Klimatrol Environmental Systems Ltd., a REHAU technical associate, provided the parts and piping for the system, which is comprised of RAUPEX pipe, F2080 fittings and PRO-BALANCE manifolds. The casino is located near the Horseshoe Falls, which gives off a mist throughout the year that can result in dangerous ice during cold weather, so the project was important in increasing safety around the casino. “REHAU was selected for this project because of the reliability and credibility of its product.” “Snow and ice melting systems are becoming more common in Canada because of winter conditions where wide and sloped areas need to be clear all year round,” says Sal Fiorillo of Sayers and Associates, the mechanical contractor for the casino project. The Fallsview Casino Resort in Ontario, Canada installed REHAU’s hydronic snow and ice melting system featuring RAUPEX O 2 Barrier crosslinked polyethylene (PEXa) pipe in order to efficiently clear accumulated snow and ice from pathways.
Supplier components for commercial vehicles and cars